Case Studies
-
Honda Canada Headquarters
- Corporate Campus
- Commercial
The newly built Honda Canada Headquarters located in Markham, ON consists of three buildings; a four-storey LEED® certified head office, a center for research and development, engineering and training and a parts distribution facility. The complexity of this multi-use, multi-building campus made Fifth Light Technology the clear choice for lighting controls. The indoor and outdoor lighting fixtures included HID, linear fluorescent, and compact fluorescent lamp types.
Learn MoreLighting energy consumption reduced by 56%
A Centrally Controlled DALI Network of 2,135 Devices
10 Year Life Cycle Cost Savings of $500,000
Consolidated energy reporting and lighting control for a Unified Campus Network
-
CIBC Bank Branch
- Retail
With a network of hundreds of branches throughout Canada, CIBC selected Fifth Light to install a lighting system within a branch in Markham. In the pursuit of sustainability, the system was designed to meet strict requirements, as highlighted below. The installed solution has significantly reduced lighting energy consumption and presents a useful example of the value of Fifth Light solutions in buildings of any size.
Learn MoreLighting energy consumption reduced by 76%
A payback period of 2.0 years
Annual Green House Gas Savings of 77 tonnes
User based scheduling and control allows for Personalized Light Levels
-
AstraZeneca Canada Headquarters
- Corporate Campus
- Commercial
AstraZeneca Canada, a world leader in pharmaceutical research and development, chose to incorporate a Fifth Light Solution in their existing headquarters campus in Mississauga. The lighting controls of the Health & Wellness Centre of this multi-facility campus were retrofitted with Fifth Light controls. As part of AstraZeneca's ongoing commitment to reducing environmental impact, the Fifth Light solution has proven to be effective at reducing energy consumption with an attractive return on investment.
Learn MoreLighting energy consumption reduced by 54%
A system payback period of 0.9 years
Annual greenhouse gas reduction of 167 tonnes
Shared information for Building Automation System Integration
-
LIUNA Centre
- Commercial
Fifth Light Technology played a vital role in the construction of Oakville's first LEED® silver certified offce building. The recently completed LIUNA Centre in Oakville is a seven storey (150,000 sq ft) commercial facility that will house a variety of tenants. The low-rise tower is adjacent to a main highway artery through the city and a popular green space, with public visibility being a key concern. As a result, an advanced Fifth Light Solution was chosen for the lighting controls of the entire facility.
Learn MoreLighting energy consumption reduced by 64%
Individually addressable fixtures with input voltage of 347 V
System payback period of 3.2 years
Ease of upgrades and tenant customization by utilizing DALI open protocol
-
MMM Group
- Commercial
The MMM Group is a professional engineering consulting firm that required energy efficient lighting for its new head quarters building. Before moving into the 8 storey, 200,000 sq. ft. of facility, the MMM group evaluated a variety of energy efficient lighting options and decided to deploy a dimmable lighting system.
Learn MoreLighting energy consumption reduced by 51%
Lighting Power Density reduced to 0.7 W/sq ft
Greenhouse gas emission reduction 150 tonnes a year
An Additional 6 LEED Points
-
Sault Area Hospital
- Healthcare
The consortium of Ellis Don, Carillion and Honeywell chose Fifth Light to provide the lighting system for the Sault Area Hospital (SAH). The energy management and operational benefits of Fifth Light's Enterprise Lighting Solution proved to be cost effective for the 3 storey, 500,000 sq. ft. facility. Fifth Light pioneered the automatic tube fault detection and dispatch feature for this project.
Learn MoreLighting energy consumption reduced by 45%
A Centrally Controlled DALI Network of 7,165 Devices
25 Year Life Cycle Cost Savings of $4.3 Million
Automatic Detection and Email Dispatch for Lamp & Ballast Status