Projects
Fifth Light is a leader in the deployment of centrally controlled digital lighting systems. We have designed, programmed and commissioned some of the largest and most complex lighting systems in North America. Our team has extensive experience with the Digital Addressable Lighting Interface (DALI), converged networks and systems integration.
We specialize in consolidating multiple facilities together through secure connectivity and in delivering projects that require a high degree of software customization. Our customers recognize that operational excellence is critical to achieving optimal system performance.
Featured Clients
-
Honda Canada Headquarters
The newly built Honda Canada Headquarters located in Markham, ON consists of three buildings; a four-storey LEED® certified head office, a center for research and development, engineering and training and a parts distribution facility.
Case StudyLighting energy consumption reduced by 56%
A Centrally Controlled DALI Network of 2,135 Devices
10 Year Life Cycle Cost Savings of $500,000
-
CIBC Bank Branch
With a network of hundreds of branches throughout Canada, CIBC selected Fifth Light to install a lighting system within a branch in Markham. In the pursuit of sustainability, the system was designed to meet strict requirements.
Case StudyLighting energy consumption reduced by 76%
A payback period of 2.0 years
Annual Green House Gas Savings of 77 tonnes
-
AstraZeneca Canada Headquarters
AstraZeneca Canada, a world leader in pharmaceutical research and development, chose to incorporate a Fifth Light Solution in their existing headquarters campus in Mississauga.
Case StudyLighting energy consumption reduced by 54%
A system payback period of 0.9 years
Annual greenhouse gas reduction of 167 tonnes
-
LIUNA Centre
Fifth Light Technology played a vital role in the construction of Oakville's first LEED® silver certified offce building. The recently completed LIUNA Centre in Oakville is a seven storey (150,000 sq ft) commercial facility that will house a variety of tenants.
Case StudyLighting energy consumption reduced by 64%
Individually addressable fixtures with input voltage of 347 V
System payback period of 3.2 years
-
Sault Area Hospital
The consortium of Ellis Don, Carillion and Honeywell chose Fifth Light to provide the lighting system for the Sault Area Hospital (SAH). The energy management and operational benefits of Fifth Light's Enterprise Lighting Solution proved to be cost effective for the 3 storey, 500,000 sq. ft. facility.
Case StudyLighting energy consumption reduced by 45%
A Centrally Controlled DALI Network of 7,165 Devices
25 Year Life Cycle Cost Savings of $4.3 Million
Market Sectors
Fifth Light has deployed advanced DALI lighting solutions in variety of applications. We specialize in providing consolidated control over large, high security and customized lighting systems.